Phone
+972 523 926 462

E-mail: info@hydra-filter.com

Skype: Hydra


Main » Enquiry

Enquiry

Please note that all fields marked with an asterisk ( * ) must be completed.

Company name
Full name*
Mobile
Fax
E-mail*
Technical data:
Feed water source:  Municipal water line
 Groundwater
 Surface water
 Reclaimed water
 Process water
 Sea water
 Waste water; 
Are there any water treatment systems installed (including settlers, tanks)  Yes - Description:   

  What to add/change?

 No
Feed water flow m3/h,
Under pressure bar
Pumps are needed  Yes
 No
Feed water pipe internal diameter mm.,   material
Outlet pipe internal diameter mm.,   material
Feed water temperature Min. 0С   Max. 0С
Treated water flow l/sec   m3/h   m3/day   m3/month  
Treated water pressure Min. bar   Max. bar
Water treatment system operating period h/day
Storage tanks for treated water m3,   material
Treated water will be used for   Drinking
 Domestic use
 Heating equipment
 Food industry
  Industry
  Pretreatment
 Discharging to surface source
Describe the production
Water should be treated according certificate
Requirements:
ParameterMeasureFound in analysis Treated water requirements
Min.Max.Less thanMore than
Odorpoint
Tastepoint
Colordegree
TurbidityFTU / mg/l
рНpH
OxidabilitymgО2/dm3
Dry residuemg/l
ConductivityµS/cm
Namg/l
Camg/l
Mgmg/l
Kmg/l
Hardnessmol/m3
Alkalinitymol/m3
Bicarbonatesmg/l
Sulfatesmg/l
Chloridesmg/l
NH4mg/l
Nitritesmg/l
Nitratesmg/l
Almg/l
Bamg/l
Bemg/l
Bmg/l
Total Femg/l
Fe ++mg/l
Cdmg/l
Comg/l
Simg/l
Limg/l
Mnmg/l
Cumg/l
Momg/l
Asmg/l
Oil-productmg/l
Nimg/l
Ozonemg/l
Hgmg/l
Hydrogensulfidemg/l
Pbmg/l
Semg/l
Srmg/l
CO2mg/l
Clmg/l
Fixed chlorinemg/l
Phenolsmg/l
Phosphatesmg/l
Fmg/l
Crmg/l
Cyanidesmg/l
Znmg/l
Iµg/dm3
Special requiraments  Purification
 Degasification
 Dechlorination
 Deoxygenation
 Carbon Dioxide (CO2) Removal
  Composition of salt correction
 Correction ofрН
 Dealkalization
Describe other requirements
Equipment would be installed in:
Place  I do have a place
 The place is under construction
 The place will be constructed according to equipment layout
Floor space (m) Length   Width   Height  
Design  In container
 Mobile plant
 Special requirements
Please, describe special requirements for equipment design:
Requirements for automation:
 Manual
 Semi automatic
 Automatic Clean and regeneration cycles start up:
 by time
 by period
 by water quantity
 by water quality
 other